Specifications and process
Equipment, engineering responsibility and turnaround times.
- 01
Hardened tool steel and complex geometry
Hardened material · complex geometry
Machining: hardened tool steel, thin walls, deep pockets, positional tolerances across multiple setups | EDM/wire-cut: Sodick | Finish grinding: Okamoto, Chevalier.
- Hard materialTool steel, stainless steel (SKD11 · SKD61 · D2 · H13 · 17-4PH · 420)
- Geometry3, 4 and 5-axis milling · thin-wall and deep-pocket parts
- EDM/wire-cutSodick | Machining of internal corners and tight radii.
- Finish grindingOkamoto, Chevalier | Typical tolerance: ±0.005 mm.
- 02
RFQs are handled by engineers
Single point of contact for engineering and sales
Engineer responsible for the RFQ through shipment | Scope: machinability, tolerances, fixturing, material changes.
- Drawing reviewResponsible engineer
- Technical clarificationMissing information confirmed
- Machining documents2D drawing; STEP for reference
- SubstitutionWritten approval before production.
- 03
Short lead times, three shifts a day
One floor · three shifts
Processes: milling, turning, grinding, EDM, inspection | 3 shifts/day | Prototype: 3–7 days | Small batch: 7–14 days | Repeat batches: agreed schedule.
- Prototype3–7 days
- Small batch7–14 days
- Mass productionBy agreement, scheduled when the PO is accepted
- Capacity85 CNC machines running three shifts a day
- 04
Weekly progress update
Progress report contents
Weekly update by email: current operation; quantity completed; next step; issues affecting delivery date.
- FrequencyEvery week while the order is open
- ContentsStep reached · quantity complete · next milestone · risks
- Issues identifiedReported when found, together with the available options
- Delivery schedule changesNotified by phone
- 05
RFQ response within 24 business hours
Quotation time
RFQ: 2D PDF, STEP/IGES, quantity, required delivery date | Technical response/quotation: within 1 business day once information is complete.
- TurnaroundWithin 24 business hours
- What we need2D PDF + STEP / IGES · material · quantity · tolerance · finish
- Missing informationConfirmed before quotation
- RFQ channelsEmail, WhatsApp, Zalo